This project will be the first in the flagship Biomass2Energy Program

INDONESIA

This project will begin construction 3rd quarter of 2015 with the objective of Biomass to Power Generation up to 3.5MW for downstream initiatives and on-off grid connection.

 

A first of its kind, where the MODULAR™ System will be integrated within the existing mill, complementing existing mill operations

 

This fully integrated mill will be self-sustaining and fully green with zero waste

 

It would manage the treatment and would have processing capacity of the following;

•Palm Oil Mill Effluent (POME) – 500M³/d

•Empty Fruit Bunch (EFB) – 150Mt/d

•Palm Kernel Shell (PKS) – 150Mt/d

 

 

PROJECT LEAD

HYPER FUSION INTERNATIONAL

 

 

PROJECT PROFILE

 

               POWER GENERATION: BIOMASS 2 ENERGY

 

 

               MODULAR

 

 

PROJECT STATUS

DESIGN & DEVELOPMENT STAGE

)

Biomass 2 Energy

 

Biomass is clean energy. It is sustainable.  Biomass has become one of the most commonly used renewable sources of energy in the last two decades, second only to hydropower in the generation of electricity.  It is one of the most plentiful and well-utilised sources of renewable energy in the world.  

 

Below are Biomass 2 Energy Projects from Hyper Fusion International

 

KESEDAR Perkilangan Sdn Bhd

KESEDAR Perkilangan Sdn Bhd

KESEDAR Perkilangan Sdn Bhd

KESEDAR Perkilangan Sdn Bhd

KESEDAR Perkilangan Sdn Bhd

KESEDAR Perkilangan Sdn Bhd

KESEDAR Perkilangan Sdn Bhd

KESEDAR Perkilangan Sdn Bhd

KESEDAR Perkilangan Sdn Bhd

KESEDAR Perkilangan Sdn Bhd

Hyper Fusion Biomass Energy Plant

Hyper Fusion Biomass Energy Plant

Hyper Fusion Biomass Energy Plant

Hyper Fusion Biomass Energy Plant

Hyper Fusion Biomass Energy Plant

Hyper Fusion Biomass Energy Plant

Hyper Fusion Biomass Energy Plant

Hyper Fusion Biomass Energy Plant

Hyper Fusion Biomass Energy Plant

Hyper Fusion Biomass Energy Plant

Hyper Fusion Biomass Energy Plant

Hyper Fusion Biomass Energy Plant

PROJECT LEAD

HYPER FUSION INTERNATIONAL VENTURES (INDONESIA)

 

 

PROJECT PROFILE

INTEGRATED PALM BIOMASS MANAGEMENT (MODULAR SYSTEM)

 

                    POWER GENERATION: BIOMASS 2 ENERGY

 

 

                    MODULAR

 

 

PROJECT STATUS

SETTING UP A LOCAL JOINT-VENTURE ENTITY

COMMERCIAL DISCUSSIONS 

 

PROJECT LEAD

HYPER FUSION INTERNATIONAL VENTURES (CAMBODIA)

 

 

PROJECT PROFILE

INTEGRATED PALM BIOMASS MANAGEMENT (MODULAR SYSTEM)

 

                    POWER GENERATION: BIOMASS 2 ENERGY

 

 

                    MODULAR

 

 

PROJECT STATUS

SETTING UP A LOCAL JOINT-VENTURE ENTITY

COMMERCIAL DISCUSSIONS 

 

IMG_20150603_133311.jpg

IMG_20150603_133311.jpg

IMG_20150603_133349.jpg

IMG_20150603_133349.jpg

IMG_20150603_132742.jpg

IMG_20150603_132742.jpg

HYPER FUSION BIOMASS ENERGY PLANT

CAMBODIA

Energy

KESEDAR PERKILANGAN SDN. BHD.

This Integrated Biomass Plant is constructed with
a total area of 2,623.19m² and the plant floor
at 1,404.72m²

 

The system manages and treats the following

palm oil biomass:

1. Palm Oil Mill Effluent (POME)

2. Palm Oil Decanter Cake (PODC)

3. Palm Kernel Shell (PKS)

4. Palm Decanter Cake (PDC)

 

With a processing capacity of the below:

1. POME – 200M³/d

2. PODC – 150Mt/d

3. PKS – 150Mt/d

4. PKC - 150Mt/d

 

All 3 sub-system are producing HFI Fusion Fuel Pellets, currently used for export to Korea

 

Powering Sustainability