INDONESIA
This project will begin construction 3rd quarter of 2015 with the objective of Biomass to Power Generation up to 3.5MW for downstream initiatives and on-off grid connection.
A first of its kind, where the MODULAR™ System will be integrated within the existing mill, complementing existing mill operations
This fully integrated mill will be self-sustaining and fully green with zero waste
It would manage the treatment and would have processing capacity of the following;
•Palm Oil Mill Effluent (POME) – 500M³/d
•Empty Fruit Bunch (EFB) – 150Mt/d
•Palm Kernel Shell (PKS) – 150Mt/d
PROJECT LEAD
HYPER FUSION INTERNATIONAL
PROJECT PROFILE
POWER GENERATION: BIOMASS 2 ENERGY
MODULAR
PROJECT STATUS
DESIGN & DEVELOPMENT STAGE
)
Biomass 2 Energy
Biomass is clean energy. It is sustainable. Biomass has become one of the most commonly used renewable sources of energy in the last two decades, second only to hydropower in the generation of electricity. It is one of the most plentiful and well-utilised sources of renewable energy in the world.
Below are Biomass 2 Energy Projects from Hyper Fusion International
![]() KESEDAR Perkilangan Sdn Bhd |
---|
![]() KESEDAR Perkilangan Sdn Bhd |
![]() KESEDAR Perkilangan Sdn Bhd |
![]() KESEDAR Perkilangan Sdn Bhd |
![]() KESEDAR Perkilangan Sdn Bhd |
![]() Hyper Fusion Biomass Energy Plant |
---|
![]() Hyper Fusion Biomass Energy Plant |
![]() Hyper Fusion Biomass Energy Plant |
![]() Hyper Fusion Biomass Energy Plant |
![]() Hyper Fusion Biomass Energy Plant |
![]() Hyper Fusion Biomass Energy Plant |
PROJECT LEAD
HYPER FUSION INTERNATIONAL VENTURES (INDONESIA)
PROJECT PROFILE
INTEGRATED PALM BIOMASS MANAGEMENT (MODULAR SYSTEM)
POWER GENERATION: BIOMASS 2 ENERGY
MODULAR
PROJECT STATUS
SETTING UP A LOCAL JOINT-VENTURE ENTITY
COMMERCIAL DISCUSSIONS
![]() |
---|
![]() |
![]() |
![]() |
![]() |
![]() |
PROJECT LEAD
HYPER FUSION INTERNATIONAL VENTURES (CAMBODIA)
PROJECT PROFILE
INTEGRATED PALM BIOMASS MANAGEMENT (MODULAR SYSTEM)
POWER GENERATION: BIOMASS 2 ENERGY
MODULAR
PROJECT STATUS
SETTING UP A LOCAL JOINT-VENTURE ENTITY
COMMERCIAL DISCUSSIONS
![]() |
---|
![]() |
![]() IMG_20150603_133311.jpg |
![]() IMG_20150603_133349.jpg |
![]() IMG_20150603_132742.jpg |
![]() |
![]() |
![]() |
![](https://static.wixstatic.com/media/f6d378_598ee68375e54b95b85cde9581a96b32.png/v1/fill/w_76,h_54,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/f6d378_598ee68375e54b95b85cde9581a96b32.png)
![](https://static.wixstatic.com/media/f6d378_9ef9ba1d7d3e4a71aaef2f768b4a0b82.png/v1/fill/w_26,h_32,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/f6d378_9ef9ba1d7d3e4a71aaef2f768b4a0b82.png)
![](https://static.wixstatic.com/media/f6d378_9ef9ba1d7d3e4a71aaef2f768b4a0b82.png/v1/fill/w_29,h_35,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/f6d378_9ef9ba1d7d3e4a71aaef2f768b4a0b82.png)
![](https://static.wixstatic.com/media/f6d378_598ee68375e54b95b85cde9581a96b32.png/v1/fill/w_76,h_54,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/f6d378_598ee68375e54b95b85cde9581a96b32.png)
HYPER FUSION BIOMASS ENERGY PLANT
CAMBODIA
Energy
![](https://static.wixstatic.com/media/f6d378_a188e576bab9406ca2098e8709e93fef.png/v1/fill/w_78,h_152,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/f6d378_a188e576bab9406ca2098e8709e93fef.png)
KESEDAR PERKILANGAN SDN. BHD.
This Integrated Biomass Plant is constructed with
a total area of 2,623.19m² and the plant floor
at 1,404.72m²
The system manages and treats the following
palm oil biomass:
1. Palm Oil Mill Effluent (POME)
2. Palm Oil Decanter Cake (PODC)
3. Palm Kernel Shell (PKS)
4. Palm Decanter Cake (PDC)
With a processing capacity of the below:
1. POME – 200M³/d
2. PODC – 150Mt/d
3. PKS – 150Mt/d
4. PKC - 150Mt/d
All 3 sub-system are producing HFI Fusion Fuel Pellets, currently used for export to Korea